23 Feb WK Standard Practice for On-Site Inspection of Installed Firestops. ASTM E / E, Standards for the Inspection of Installed Firestop Systems samples the production process for firestop installation through a standard. Fire-resistance-rated construction exists in many new and older buildings throughout the. US and Canada. Gaps are made at the top of walls to allow for.

Author: Nikokasa Tojagore
Country: Tunisia
Language: English (Spanish)
Genre: Literature
Published (Last): 16 June 2009
Pages: 110
PDF File Size: 17.92 Mb
ePub File Size: 2.98 Mb
ISBN: 892-5-64419-134-3
Downloads: 31582
Price: Free* [*Free Regsitration Required]
Uploader: Tushakar

This alleviates to a certain degree the need for the AHJ to have the in-depth knowledge needed asttm thoroughly inspect the penetration, joint and building asgm firestops. This inspection guideline is not intended to be all encompassing or to be used as a design guide. The fire test results are usually astm e 2174 as design listings in the fire resistance directories published by the testing laboratory.

Is the astm e 2174 or fire inspector familiar with the code requirement for penetration firestop systems and fire resistive joint systems?

Below is astm e 2174 FCIA-suggested specification language from www. A thorough knowledge of the design listing information is critical to firestop astm e 2174. For dynamic ashm systems, a specific number of expansion and contraction cycles precede the fire test in order to measure the movement capabilities of the joint systems.

Specialty firestop contractors now have a way to separate themselves from others who have not embraced the quality process.

ASTM E – 14b – Standard Practice for On-Site Inspection of Installed Firestops

Tested systems should always be specified unless EJs astm e 2174 the only option. The registered design professional in responsible charge and engineers of record involved in the design of the project are permitted to act as the approved agency and their personnel 2714 permitted to act as special inspectors for the work designed by them, provided they qualify as special inspectors. Investment astm e 2174 the correct contractor, with processes that result in documented systems installed in the field, means that value is received for products, systems, and ashm.

Manufacturer cut sheets are often accepted if they are generated by an approved testing agency. Membrane Penetration – A breach in one astm e 2174 of a floor-ceiling, roof-ceiling or wall assembly to accommodate an item installed into or passing through the breach. It is designed to be part of the total quality protocol axtm for zero-tolerance firestop systems installation.

Major elements of quality firestop inspections are: These Directories are an important source of information during the plan review process and inspection process.

Fireblocking – Building materials, or materials approved for use as fireblocking, installed to resist the free passage of flame astm e 2174 other areas of the building through concealed spaces.

Other specification sections, such as Thermal and Moisture Protection, Insulation, Drywall, or Mechanical and Plumbing sections, might include references to firestopping materials. Are astn unsure of the compliance of a specific firestop assembly with the listed design?

A modification to a tested system voids the rating of the system. Through-Penetration Firestop System – An assemblage consisting of a fire-resistance-rated floor, floor-ceiling, or wall assembly, one or more penetrating items passing through the breaches in both sides of the assembly and 214 materials or devices, astm e 2174 both, installed to resist the spread of fire through the assembly for astm e 2174 prescribed period of time. Northbrook, IL www.

Engineering Judgment Guidelines Inspection Guidelines. It is not usually feasible to visually inspect each penetration and the entire length of every joint.

These standards shall be referenced when third party inspections e. Refer to the design listings and astm e 2174 datasheets Are the specified fire astm e 2174 joints tested for the amount of movement and type of movement required?

The amount charged for inspection can be staggering. Where deficiencies are found, the contractor should repair or replace the firestopping so that it complies with the requirements of the tested and listed system design. The new UL program affirms that the subcontractor quality process atm gathering momentum.

How many inspections are enough? Inspectors tell FCIA that inspection astm e 2174 rise dramatically with multiple trades and varied field applications involved. Hence, Firestop systems details and materials should astm e 2174 included on the plans and specifications. Follow-up audits are done yearly by FM, with the same destructive testing employed by FM personnel. Each firm will have its astm e 2174 way of handling the quality process. Check Point – Have you checked your local code requirements?

With a few exceptions, the s and materials used in penetrations and 22174 are tested as a system to demonstrate the methods and materials function as fire containment for the required fire endurance rating.

Firestop Systems Contractor Quality and Inspection—a Standard Process

Firestop manufacturers test their products, manufactured to strict tolerances, and publish systems suitable for use as firestops in the Underwriters Laboratories, Inc. Perimeter Fire Barrier System – An assemblage of specific materials along the perimeter of a floor with an hourly fire endurance rating and a non-rated exterior curtain wall to ensure continuity of the separating function of the floor assembly.

Why Bother to Become Approved? Who is going to conduct the inspections and when? Many policies are required by either FM or UL, r each firm is unique astm e 2174 how it selects systems, communicates the appropriate astm e 2174 to the field, and then ensures that the firestopping is installed to tested and listed system astm e 2174.

Is the joint intended to ashm load bearing, and is it indicated as a load bearing system in the listings? Check Points Is the firestop system Listed? Is the specified joint tested and listed to comply with the amount and type of expected building movement? Are the specific firestop system details included on the plans?

The pre-construction meeting should also be used to: Ee tests also include provisions for measuring the T rating and the optional L rating. To provide a construction sstm protocol program, FCIA created a standard for quality astm e 2174 in the construction subcontracting industry: